Showing posts sorted by relevance for query S5. Sort by date Show all posts
Showing posts sorted by relevance for query S5. Sort by date Show all posts

March 26, 2024

India's future S5 SSBN Boasting K-6 SLBMs

On March 22. 2024 Gessler provided some very interesting links, photos and comments along the lines:

"On Pete's note regarding the K-5 SLBM's possible 14m height, something comes to mind:


Photo A - By now we've all seen the first (publicly known) hydrodynamic model (photo above - source https://ibb.co/F3DPCJg ) of the future S5-class full sized Indian SSBN with a prominent missile compartment (or 'hump').

Its hump obviously speaks to the size of the SLBMs it's designed to carry. However, that S5 design (which I'm assuming is only one of many being tested) is now at least 6 years old, considering the first public sighting/leak was in 2018. 


Photo B - More recently I've come across what could be a newer iteration of the evolving S-5 design (see photo above - source https://ibb.co/Wnf9sQK ). This is from an official publication earlier in 2024. Again, there is no context or specific information provided about the program, so we know just as little regarding the program's current status as before.
[Pete comment Wikipedia's drawing apparently from a visit to DRDO supports Photo B being the more likely shape of the S5 class.]

Of note is obviously the fact, at Photo B, that the missile compartment is now far more streamlined into the submarine's hull. Could this be an indication that DRDO's propulsion advancements in ballistic missile development have resulted in a smaller and/or lighter missile being sufficient to reach the same range with the same payload as before? I can only guess.

There are also other differences, such as the dive planes being moved onto the sail/conning tower (which is more in line with how most submarines have them) as opposed to the previous model which had them on the hull in front of the sail (like on UK's Vanguard-class).

Pete Comment

Yes. Ever smaller missiles are achieving longer ranges. This is through use of lighter composite materials, for many parts and casings, rather than using heavier steel. Also solid fuel propellants are being developed that are more energy intensive per kg. 

Furthermore lower throw-weights requiring less boost can be achieved through greater miniaturisation of warheads and MIRV "buses" with no reduction in explosive power. Changing from heavier "old school" boosted fission to 2 staged thermonuclear warheads is one way to achieve smaller, lighter warheads. Increasing accuracy (ie. smaller, lower CEP) can make smaller, lighter warheads (say of 100kT as effective (eg. on deep dug bunkers) as effective as older larger multi-megaton warheads). 

Looking at Wikipedia's entry for the future S5-class SSBN it will be:

-  13,500 tonnes (presumably surfaced)

- it might carry K-5 SLBMs but with severe range limitations of only 6,000km (barely adequate to hit Beijing). This might mean an S5 might need to operate in waters near land. Chinese patrol aircraft based in Myanmar might strike it. Also fixed Chinese undersea sensors might detect it. Or its possible patrol area is within a predictable seaspace for  Chinese SSNs or Pakistani SSKs (lurking near the Vizag current Indian SSBN base) to detect it. 

-  So its better to carry between 12 and 16 much longer range K6 SLBMs . Not yet developed K6s might be just over 12m tall. With a 3,000kg (presumably max) MIRVed payload its range might be the minimum 8,000km for patrolling in a "safe haven" south of Diego Garcia but still in range of Beijing. 
=  With a 
1,000kg "light load" a K6 SLBM might have range of 12,000km allowing the S5 SSBN to be safer, far into the southern Indian Ocean, yet still in range of Beijing. 

May 4, 2026

Possible influences on India's future S5 SSBNs

A comment following Gessler's fine April 25, 2026 article is: 

As well as Kilo square sail characteristics influencing the Arihants, Russia's Delta SSBNs (with similar square sails side on) and hump back would influenced India's  Arihant designs. 



What INS Arihant (and Arighaat) may look like. Note square sail, planes on sail and hump back (Artwork courtesy H I Sutton at Covert Shores).
---


I theorise that Russia has suffered so much financially from Ukraine war sanctions and higher tri-service defence spending that Russia may have traded accelerated SSBN and SSN design secrets to India. Unlike China (1969) India has no record of fighting Russia. So little risk for Russia that its defence tech exports to India would be used against Russia.

In return guaranteed Indian purchases of Russian oil and gas and joint energy projects have been considerable.

Its possible the now 30 year old Russian Borei/Borey SSBN design features will influence India's future full size S5 SSBNs. Also design features of the French and now German SSKs sold to India will influence India's S5 SSBNs.

 
Possible Borei/Borey SSBN design (Artwork courtesy Mike1979 Russia - Own work at Wikipedia (right sidebar).
--- 

Overt and covert intelligence gathering (proud professions) about current UK, US, Chinese and French SSBN programs, would also influence India's S5 designs.

See previous Submarine Matters articles on the S5s HERE.

February 21, 2022

India's full size SSBN Program S5 Alive: Alpha SSNs

Gessler provided interesting insights into India's S5-class SSBN and Alpha SSN Programs on February 18, 2022:

1) Pete Question: What happens if India takes 20 years to commission the first Alpha SSN? This is taking into account the standard 15 years for a new submarine class + 5 years first Alpha-class indigenous SSN. 

Gessler responds: Firstly, I have no idea as to what level the design/development work on the SSN program has been completed, but like I said previously on your blog much will depend on which way they choose to go (an Arihant shape without silos, or a completely new design).  

Either way, once construction starts I'd estimate a minimum of 8 and maximum of 11 years for the first-of-class boat to be commissioned. [This could taken into account India's approval of the Alpha Project on February 2015] So if the keel is laid by around 2025, a mid-2030s date for the first boat to be handed over to the Indian Navy. Again, the time will be hugely dependent on how different the boat is compared to the Arihant. 

If its like the aforementioned "Arihant without Silos" with only minor changes/modifications, the build time is likely to be relatively short, especially if its coming off the same production line that's been building the Arihant-class (which will be free after S4* is done, which is more than likely well into construction).

Speaking of not knowing the stage of construction, you will see that all nuclear submarine development efforts in India are about as secretive as the Chinese ones are. The only exception was the SSN program due to the funding issue (explained below). For example nobody knows what's the status of the next-gen SSBN program (S-5)...which is an example of a program where the funding modalities were already worked out (carried over from Arihant's methodology).

Out of the blue, S5's possible shape was Indian Vice President Tweet 'leaked' on August 28, 2019 that hydrodynamic testing of S-5-class designs was going on.

Possible shape of the future Indian S5 aka S-5-class SSBNs (Courtesy H I Sutton's Covert Shores http://www.hisutton.com/S-5_SSBN.html )
---

...and what appears (to my untrained eye) to be a new, larger building dock (actually two docks side by side) well into construction beside the existing one at Ship Building Center (SBC) Vizag (aka Visakhapatnam) which popped out the S2, S3 & S4 - both the new docks are large enough (about 185 meters long) to accommodate even Ohio-sized vessels (170 meters), so likely intended for S-5 construction, though one of the two could be earmarked for SSNs: https://ibb.co/Hhg2ryZ 

The point being, while we can observe from the public domain the tussle over who's going to pay for the construction, there's no real way to know the exact status of the design & development work (which understandably has to be in place & has to be binding before construction starts) surrounding any of India's N-sub programs.

------------------

2) Pete Question: What impact does the death of the Alpha SSN’s highest level champion, Chief of Defence Staff General Bipin Rawat, who died in a helicopter crash on December 8, 2021 have on the Alpha SSN Program? 

Gessler respond's: I'm pretty sure the General's unfortunate death will negatively effect several aspects of the plan for Theaterization of Combatant Commands - however I doubt it will have a noticeable effect on the SSN program itself, because as far as I can tell, consensus on the program & its funding was already reached prior to the General's passing.

That said, the issue was never that the Indian Navy did not want SSNs, it was regarding who would fund the said program - whether the funds will come out of the Navy's own capital outlay (which would require them to prioritize/cut down on programs like IAC-2) [was to be named INS Vishal], or would the Prime Minister's Office (PMO) directly requisition the funds from its Cabinet/Finance Ministry for the program (as was the case for funding of the 'strategic' Arihant-class SSBNs). 

Till recently the Navy wanted the PMO to foot the bill for the SSN program, and as such every single public/media interaction with Navy leadership would have the Admirals referring to the SSBN & SSN programs as being under the same 'strategic gamut' - even though in all likelihood the SSNs will not be carrying any nuclear weapons.

Now that the matter has been settled (that the funding for SSN will come from Navy's own budget), I doubt the Admirals have much wiggle room left as doing so would certainly not earn them any favours from either the PMO or the Indian National Security Advisor Ajit Doval's office and/or National Security Council.

April 7, 2021

India's 6 Future Alpha SSNs - SSBN Protectors

These are my comments following March 31, 2021's "India's future 6 SSNs over 3rd Carrier: Internal Leverage." 

India has been discussing the development of 6 x SSNs, now dubbed "Project 75 Alpha" since the 1990s. There has been endless talk and breathless Indian media reporting that these Indian SSNs (lets call them Alphas) will be built "very soon" for the last 15 years. 

India, like most nuclear submarine-nuclear weapon powers, has had to juggle needs to fill out all 3 "legs" of the nuclear triad. That means India has simultaneously developed  nuclear weapons dropped by aircraft and mounted on long range land based missiles. SSBNs with their SLBMs, are the last, hardest and longest to develop, leg of the Triad. Meanwhile India has been talking about developing Alpha concepts before it can get around to "cutting steel" - noting the highest priority of Alpha SSNs is to protect SSBNs.   

INS Chakra II and eventually III

India already has been transferring technology from its 30 year old design Russian built Akula SSN known as INS Chakra II (ex Nerpa) (see artwork below).  Chakra II has been under 10 year lease since 2012 from Russia - so lease expiration may be in 2022. The lease may be extended if Russia is unable to supply a later model Akula (unofficially named “Chakra III”) by about 2025.  Chakra II and then III hulls were designed in the early 1980s may not be carrying torpedoes or anti-ship missiles permitting them to be truly operational in defending Arihant-class SSBNs. I'm aware of no reports of  Chakra II regularly pulling out of its base at India's Eastern Naval Command HQ - Visakhapatnam or returning to "Visak". So Chakra II's main value may be limited Indian crew training and/or Russian  transfer of technology (ToT) to India. 

Training and ToT would include Chakra II's 190MW OK-650 reactor which may be running in place while not actually moving the sub. An Indian variant of the full 190MW power of the OK-650 reactor will be more than adequate to power India's future 13,500 tonne (surfaced) S5-class full size SSBNs (see artwork below). Significant updated variants of the OK-650 already power Russia's latest Borei/Borey class SSBNs (see right sidebar).

Meanwhile Indian nuclear crew training continues on INS Arihant and soon Arihant's sister-sub INS Arighat. 

French Barracuda SSN and K15 Reactor Value

India’s 6 x Alphas may have some features of India’s 8,140 tonne Chakra “II”. But India talks more of a 6,000 tonne Alpha that would, of course, have many design differences to a 8,140 tonne Chakra II. India understandably has an interest in French Naval Goup ToT from its 5,300 tonne (submerged) French Barracuda class very modern SSN which is likely to be much quieter than 38 year old hull technology Chakra-Akulas.  Naval Group may be enticed to release more Barracuda details if this is packaged with India purchasing 6 x Scorpene (AIP) SSKs under the endlessly discussed and delayed Project-75I. 

While a Russian OK-650 reactor would be too large for a 6,000 tonne Alpha Russia and India may want to investigate the Barracuda’s K15 reactor. Obtaining K15 details from France via India would constitute an intelligence coup for Russia. For India an enlarged, more powerful, variant of the K15 may be sought. The K15’s main limitation being its need to refuel every 7-10 years. India would value a fuel core more at 15 years or even better, 35 years (whole of submarine life).

Alternatively India may rely on a highly modified variant capable of 100MW derived from  the 83MW reactor used for INS Arihant (more see) .

Alpha SSN Protection of SSBNs

The Indian government support for building 6 Alphas in India is not only a navy matter. A (or the) major task of the Alphas will be to protect India’s growing force of SSBNs. See this generalised and very useful description of India's future nuclear subs.  These SSBNs (so far only the 2 small Arihant class) will form the most secure and potent second strike arm of India’s nuclear triad. Two more slightly larger Arihants are planned - making 4 Arihant small SSBNs (aka "Baby Boomers"). The Arihants however cannot accommodate SLBMs large enough to hit the capital, Beijing, of India’s (likely) enemy China. 

A more effective second strike SSBN arm will come with the full size “S5” SSBNs (see artwork below). These S5s, which may be launched from the late 2020s/early 2030s, will be able to accommodate 12 to 16 larger, longer range, desirably "K6" SLBMs capable of hitting Beijing.



The Arihant class and INS Chakra are current. Third one down is a possible shape and comparative size of a future Indian 
Alpha SSN below that is the possible shape of a future, larger Indian SSBN class (known as S5). (Artwork and captions courtesy

H I Sutton's, Forbes article of Feb 23, 2020).
---

Bastion Protection of India's SSBNs 

India's Arihant SSBNs are believed to be noisier than Russian or Western ideal SSBN noise levels and there are no new Alphas to protect them. So India's Arihants may need to be Bastion Protected in the Bay of Bengal by India's P8 MPAs, other jet aircraft, helicopters,  surface naval ships, undersea sensors and many other sensor and weapons platforms. 

It remains unknown whether India's leased Chakra II is armed, and therefore able to provide credible protection to just one Arihant. Even if a "newer" Chakra III is leased these Akulas are early 1980s hull designs, so liable to be comparatively noisy. They would need to be able to detect far quieter Pakistani AIP-Agosta-90Bs and late model Pak-AIP-Yuan SSKs as well as Chinese AIP-Yuans and Chinese SSNs.

India's first Alpha may be delivered to the Navy in the late 2020s and will need around 3 years of testing/training/working up to be fully commissioned in the 2030s. India will then probably require 2 more Alphas to form a credible protection force of 3 Alphas (noting rule of thirds). This may need to coincide with full commissioning of the first S5 full size, and quiet, SSBN.

So India may only have a fully operational force of 3 Alphas and 3 S5s in the late 2030s.

Pete

November 3, 2024

Part 3: Slew of Developments in the Indian Nuclear Submarine Program: First Two SSNs Funded

On the 9th of October 2024, The Cabinet Committee on Security (CCS), the apex decision-making body of the Indian Government regarding all Military matters, has officially granted its final seal of approval to the Indian Navy's nuclear attack submarine program, now designated as Project-77 (previously known as Project-75A).

A sum of Rs. 40,000 crores (equivalent to about US$4.8 Billion) has been allocated toward the construction and acquisition of the first two boats out of a planned total of six.

Artistic impression of the Indian Navy's SSN by Nilanjan Das of the India Today magazine (not representative of actual design)
---

Veteran journalist Sandeep Unnithan who has reported on the Indian nuclear submarine program for over a decade has stated that the P77-class SSNs would incorporate a 190MWth reactor which would represent a generational leap over the 83-100MWth PWRs of the Arihant-class. Sandeep Unnithan can be safely assumed as having sources inside the program or at least being a 'designated' individual through which the Government and/or the Navy publicizes developments. Of note is the fact that Mr. Unnithan (then working for India Today magazine) was the first journalist who reported that the 3rd and 4th Arihant-class boats will be larger than the first two, years before the S4 boat first appeared in public. Satellite images from late 2021 vindicated him.

The new 190MWth reactor, known as CLWR-B2 is likely based on or at least built along the same lines as the Russian OK-650B that powers the Akula II-class SSN that India took on lease between 2012-2021. It would also be prudent to estimate that the CLWR-B1 that powers the Arihant-class was derived from the VM-4 reactor family that powered the Charlie-class SSGN that India leased between 1988-1991. However, any help or guidance from Russian agencies (whether in design itself or at least in the design-validation phase) is unlikely to ever be publicized by either side due to obvious reasons, such as eliciting nuclear proliferation concerns.

On both these reactors, it's likely a great deal of redesign and redevelopment was involved in order to bring them up to modern standards of the time - as well as getting them to work optimally in the warm-water conditions of the Indian Ocean as opposed to the freezing waters of Russia's operating environments. They're still likely to use the same level of reactor fuel enrichment as most Russian marine PWRs (~45% enriched HEU). However, I think it can be safe to assume that the new reactor will differ from its baseline Russian design (presumed by me to be OK-650B) to a significantly greater degree than the Arihants' reactors difference from the VM-4.

With around ~60MWe of total electrical power (assuming a 33% efficiency on a 190MWth thermal output), the P77 SSN would be well-placed to incorporate the 35MW Nuclear-Electric Propulsion (NEP) setup. This would involve a silent electric motor replacing the noisy reduction gearing used in older submarines. This is also known as Turbo-Electric Drive, known to have been in the works for the Indian Navy. Assuming this setup is indeed intended for the SSN project, it can be a reason as to why a significantly higher degree of redesign may have been necessary for the CLWR-B2's power delivery system - especially the secondary loop setup - as the OK-650B was not originally meant to work with NEP.

Above is a publicly-available Expression of Interest (EoI) document (sourced via the Twitter handle of strategicfront.org) calling for industry to develop a 35MW Electric Drive solution for future submarines of the Indian Navy.
--- 

For comparison, the French Navy's Barracuda/Suffren-class SSN uses a 20MW NEP setup fed by a 150MWth LEU reactor to drive its pumpjet propulsor. Notably, the setup on Barracuda-class is only designed to use the nuclear-electric solution up to a certain speed (let's say 20-25 knots) for relatively silent transit. Beyond 25 knots the submarine has to rely on its backup conventional propulsion that is understandably more noisy - in order to attain higher speeds (up to a maximum of 30 knots I would assume).

The Expression of Interest (EoI) documentation above also calls for the Indian NEP setup to drive the submarine to a maximum speed of 25 knots. It's likely that the P77 would also have to fall back on a conventional setup to go faster (again, let's say it can do a maximum of 30 knots or more). Either way, even without the NEP, this reactor should put the P77 in a very good place in terms of speed and performance when going up against any given opponent SSN, such as the new Type-093B of the Chinese PLA Navy. Actually, the P77 is very likely to enjoy an advantage in those regards against the Chinese boats - barring any considerable improvement the PLAN manages to make in the decade-plus it would take for the P77 to arrive.

Also worthy of note is the fact that, at least according to the the EoI document above, the nuclear-electric setup being pursued by the Indian Navy clearly calls for the P77's NEP to drive a pumpjet propulsor. Is that enough reason to assume the P77 will have a pumpjet? We'll see.

Example of a turbo-electric generator manufactured by India's state-owned BHEL corporation for commercial applications. BHEL is very likely to be the contractor responsible for building any NEP solution for future submarines.
---

This same reactor and NEP propulsion setup are also likely to drive India's upcoming "S5" class of next-gen SSBNs. The S5s will be much larger, believed to displace between 13,000-14,000 tonnes, with 12 or more vertical launch silos. The S5s will perform a very different mission (deterrence). Hence S5 reactors will have to cater for different SSBN power delivery needs  (smooth and gradual acceleration) compared to the rapid stop-starts of SSN operations.

Based on reports from official DRDO publications (pictured below) it's evident that R&D work on both conformal bow-array sonars as well as planar-arrays (ostensibly used for flank-array setups) is/has been ongoing in India for several years. It's difficult to say which R&D program might or might not find a real-world application on upcoming submarine programs. I think it can be safely said that there's at least a determination in the Indian Navy to advance past the older cylindrical-array sonar setup used in the bow of the current generation of Indian nuclear boats. Among SSNs that are currently being built, the Astute-class comes to mind as one that has a conformal bow array.

Screen-grabs from the DRDO's official 'Technology Focus' publication, detailing some R&D work on next-generation sonar solutions.
--- 

While there's no official word on this, I would estimate using a 190MWth reactor, there would be enough power on tap for the P77 SSN to incorporate additional mission sets beyond pure hunter-killer duties. This could include carrying a pack of vertically-launched Land-Attack Cruise Missiles (LACMs) like the Nirbhay. It remains to be seen what the configuration of the P77 SSN class will be. I would estimate its surfaced displacement to be somewhere between 5,000 and 7,000 tons. P77s will likely be larger than the 5,300 tonne French Barracuda/Suffren-class but possibly smaller than the Royal Navy's 7,400 tonne Astute class and the US Navy's 7,900 tonne Virginia-class (Blocks I-IV).

I personally do not believe in the reports in some sections of media (like this article from the Times of India (TOI)) that says the SSNs will displace 10,000 tons. Such a displacement would make P77s similar to submerged Improved Akulas. I think the TOI reporter in question either misinterpreted the information brief given to him, or the brief itself was a deliberate attempt at misdirection. Either way, I think we'd do well to believe that the P77 would incorporate an entirely new hull design compared to the Arihant - as I believe that the Arihant-class's internal bulkheads would probably be too small to accommodate the 190MW reactor compartment.

All that said, I think we can expect that the first P77 will be commissioned in the mid-late 2030s. This is assuming the construction starts in 2025, with a build time of between 8 and 10 years followed by sea trials. Much would also depend on how much technology being rapidly iterated over the Arihant-class finds application on the P77.

It's worth noting that even going by what's known so far, every single Arihant-class boat appears to be significantly different from the last owing to continuous technology insertion i.e. improved reactor and hull extension. It is also possible the upcoming S4* might turn out having a pumpjet. This is if a decision were taken to de-risk the P77's and S5's next-gen propulsion setup by testing the pumpjet on S4*.

It's also possible that the eventual requirement will be extended beyond the six P77s currently sought, to twelve, as I previously theorized. This is keeping in mind the construction of a new large, higher capacity, dry-dock at SBC (refer the satellite image in Part-2 of this series). It is very likely that at some point within the end of the 2020s, the Indian Navy could have both the new SSNs and S5-class SSBNs under construction at the same time, They might also be delivered simultaneously over a period of time in the 2030s. Unfortunately, being a strategic program (for carrying nuclear weapons) the funding modes for the S5-class boats will be secret. None of the public reporting such as cabinet approvals or funding details applied to the P77s will likely apply to the S5s.

The upcoming part (probably the last) of this SubMatts series will cover a few updates regarding some ancillary programs that support India's nuclear submarine effort without being directly a part of it.

March 19, 2023

3 New SSNs for Indian Navy. Russian Reactors: French Hulls?

India’s Firstpost March 17, 2023 reports, in part: 

"...According to media reports, the Indian Navy may receive approval to purchase only three nuclear submarines during the initial stage [instead of presumably 6 x Project-75 Alpha SSNs]. The original plan, which envisaged the procurement of six submarines in the initial lot has been scrapped by the defence ministry due to high procurement costs.

…It was decided in 2019 that only three submarines will be developed as part of Project-“77” [presumably meant to be Project-75 Alpha] …following the initial investment of Rs 100 crores [equivalent to only US$12 million ?] for research and development, for the program did not receive any more funds and the project still awaits clearance.

Meanwhile, France has offered a major nuclear submarine deal to India. As part of the deal, France will become a part of the Indian Navy’s program to develop 6 nuclear submarines and has also offered to share conventional technology from its Barracuda-class nuclear submarine program.”

[Earlier reported by Firstpost on March 16, 2023:

“New Delhi: The Indian Navy, which is undergoing a modernisation process, may get yet another boost as France has offered a major nuclear submarine deal to India.

As part of the deal, France will become a part of India’s program to develop 6 nuclear submarines and has also offered to share conventional technology fromits Barracuda-class nuclear submarine program… France’s offer to India is similar to a deal it had offered to Brazil earlier, which is also developing its first nuclear submarine with French assistance.

The French offer to India includes the overhauled design based on its Barracuda-class submarine for a new submarine class. This new submarine will feature pump-jet propulsion along with a [ presumably the Indian Compact Light-Water Reactor “CLWR-B2 "gentle running" for S5 SSBN and "more stop-start" B3 for Project-75 Alpha SSN ?” variant of the 190 MW thermal(t), 30 to 35 MW electrical(e) Russian OK-650 ] 190 MWt Pressurized water reactor which is currently being developed by state-owned nuclear company BARC in consultation with Russian state-owned companies.”]

Firstpost’s March 17, 2023 report continues:

“…Work on designing an indigenous nuclear submarine design by the Directorate of Naval Design also is going on at the Indian Navy’s Shipbuilding Centre at Visakhapatnam.

[A] report by Indian Defence Research Wing (IDRW) quoted officials as saying that there were disagreements [presumably between the Indian Navy versus BARC ? ] regarding who will fund the development of a new 190MW pressurized water reactor (PWR) by the Bhabha Atomic Research Centre (BARC).

The water reactors will be used to power the Indian Navy’s [SSN] nuclear submarine program and variant of the same reactor was to be developed for the S5 Class of ballistic missile submarines. [SSBNs]”.

PETE COMMENT

India's close reliance on Russia in nuclear submarine matters (including INS Chakra II /Nerpa lease 2012-2022) has raised expectations that India's Project-75 Alpha will be based on Russia's Akula-class SSN. 

On March 7, 2019, India and Russia signed a US$3 billion deal for lease of another Akula-class SSN. The submarine, dubbed "Chakra III" (possibly Russian submarine Irbis or Iribis K-519) might be delivered to the Indian Navy by 2025. 

Earlier INS Chakra II lease permitted Indian submariners and designers to closely study Russian Akula-class SSNs. Chakra III will deepen India's knowledge and experience of this class. 

Russia has developed an Akula III which is reportedly larger and quieter than other Akulas. The Akula III has likely adopted some advanced features of the follow-on Yasen-class SSN. Possibly India will base its Project-75 Alphas on the Akula III standard.

Presumably India is inviting France to offer some Barracuda SSN hull information and the Barracuda's pump-jet technology to improve India's future SSN and S5 SSBNs. India may also aim to create competition rather than totally rely on Russia in terms of direct foreign technology transfer. The Russian Borei/Borey-class SSBN also has pump-jet technology.

But if Russia is assisting with the CLWR-B2 (and maybe a "B3") reactor then Russia is firmly embedded in Indian nuclear submarine construction. So embedded that any French technology transfer can be expected to be soaked up by Russian advisors (with GRU links) in India or via Indian agents working for Russia (all the way back to 1991). 

In any case India attempting to integrate a variant or development of a Russian
OK-650 reactor with a French Barracuda hull and pump-jet, would be technically very difficult and expensive. Perhaps, then, an Indian variant of the Akula III, with a 
CLWR-B3 reactor, working to a Russian-French hybrid pump-jet, is possible.

November 4, 2024

Part 4: Slew of Developments in the Indian Nuclear Submarine Program: New VLF Station and SLBM Updates

To wrap up this Four-part SubMatts series on the Indian nuclear submarine program, I present two separate developments that emerged in mid-late 2024.

The first is the establishment of a new Very Low Frequency (VLF) communication facility of the Indian Navy in the landlocked state of Telangana in south central India. Used for communicating with submarines without requiring them to reach periscope depth, the new facility would be located some 60 km from the state's capital city of Hyderabad (where your's truly currently resides). The foundation stone marking the start of construction was laid on 16 October 2024 by Indian Defence Minister Rajnath Singh.

The new facility, which is over 300 km from the nearest coastline, offers a more survivable location which is at less risk of being attacked, destroyed or degraded compared to the current submarine communications facility which is located at INS Kattabomman. Kattabomman is in the state of Tamil Nadu and only around 20 km from the coast on the southern tip of India.

Satellite image (via Google Maps) of the facility at INS Kattabomman
---

Notably, the facility at INS Kattabomman has both VLF and ELF (Extremely Low Frequency) transmitters. The ELF band is capable of communicating with submarines at much lower depths, and is therefore more advantageous to use for nuclear-powered boats. It's not known at this time whether the new station at Telangana will also incorporate an ELF facility down the line. 

++++

The second thing I'm writing about is the SLBM program. There have been a few 'releases/deliberate leaks' of SLBM visuals let into the social media space by the authorities (as I don't believe anyone could have acquired them of their own volition).

For example, the video below which shows the K-4 SLBM being ejected from its test pontoon underwater. It then gains altitude by means of nose cap-mounted booster plumes (a method used on older Soviet SLBMs like the R-29). Then the nose cap itself is ejected and the missile's first stage solid motor takes over propulsion. A video of the above-water launch sequence existed before (it can be seen in the K-4's Wikipedia article linked above) but it was of a considerably lower quality and did not include the underwater pontoon-ejection part.

There has also been an image of what seems to be a 'salvo launch' - multiple missiles launched over a short duration - of two K-15 SLBMs, presumably from INS Arihant. It is not known when this salvo-launch test took place (possibly during this bout of testing in 2018). But it goes toward proving a significant capability when it comes to delivering effective deterrence. That is being able to launch multiple nuclear warhead-equipped missiles as quickly as possible. This would be necessary if the SSBN in question has to serve its purpose of performing second-strike. That is a retaliatory strike following an adversary's first strike (considering India has a No-First Use (NFU) policy) before the SSBN itself is probably found and destroyed.

Given the distance between the two points of launch, it would appear that this salvo-firing test was conducted from a submarine that was moving
---

A further piece of my analysis regarding the Indian SLBMs would tie-in to this older article on SubMatts. This raised the possibility of DRDO's ballistic missile-related propulsion R&D work having matured to a degree that no longer necessitated a prominent, raised missile compartment or 'hump' on the S5-class SSBN design. As the solid-fuel and rocket motor technologies advance, it becomes possible to deliver the same payload to the same range as before, but with a missile that is smaller and lighter.

On that note, this excellent comparative artwork (shown below) made by Orion Intel depicting India's Agni-5 IRBM (the government refuses to call it an ICBM). It is in its original configuration on the right, compared to the newer configuration on the left, which is based on photometric analysis of the images revealed during the MIRV test earlier this year.

Comparison of the original Agni-5 and its MIRVed version. Via Orion Intel on Twitter (now X)
---

The newer 'MIRVed' configuration - called by many 'Agni-5 Mk.2' has a different nose cone arrangement. It is noticeably shorter (note the upper black inter-stage section) than the original that was first tested over 12 years ago in 2012. This is in spite of the MIRVed configuration having to carry heavier payloads. Significant progress in miniaturization of ballistic missile stages and motors over the last decade might not be a bad conclusion to draw, although there are several other variables to take into account.

In any case a shorter Agni-5 Mk.2 would certainly explain why the newer hydrodynamic models of the S5 SSBN don't feature a prominent missile hump seen on earlier S5 test models. Improvements in R&D would find applications across the entire gamut of strategic ballistic missiles. Note that the S5s will eventually carry the more advanced, longer range K-6 SLBM. 

With that, this SubMatts series covering recent developments in India's nuclear submarine program comes to an end.

Cheers Gessler

October 1, 2019

Indian Nuclear Submarines Update

Since 2009 Submarine Matters has regularly provided updates on India's nuclear submarines. This goes back to the old name of this website “Australia By The Indian Ocean” (which Pete wrote around 2007 – 2011) and then increasing interest in submarines. In more recent years GhalibKabir (GK) has provided comments and links on these matters.

INDIAN SSBNs

The sequence of Indian SSBNs goes by S numbers:

S-1 (or S1) was an onshore test nuclear reactor reliant on extensive and expensive Russian assistance.

S-2 is INS Arihant, launched 2009, around 6,000 tonnes, a prototype SSBN constructed to test: 
-  stealth/quieting architecture, 
-  nuclear propulsion of the slow start-stop 83MW reactor, 
-  inadequate K-15 or "K15" missiles (with a safe firing point-range only adequate to hit coastal
   Pakistani cities, like Karachi) and K4 (3,500km range capable of hitting all Pakistan, central and
   southern-most China (eg. China’s Yulin/Hainan SSBN/SSN base, Guangzhou and Hong Kong)
-  central computer processing
-  combat system including sensors also to operate the 6 torpedo tubes
-  command and control, and crew procedures including damage control

S-3 INS Arighat (with expected name "Aridhaman" cancelled) incorporates upgrades and refinements which would likely include improved stealth/quieting, improved quality of missile cold launch capabilities while the sub is still moving (Pete thinks the numbers of silos remain at 4 rather than less likely 8(?)) and other SSBN aspects. GK commented September 25 “The older [2011] videos of the Layner SLBM launch by Russia are clear proof imho that the K-4 Cold launch technique was taught by Russia to India.” GK commented September 25 “The S-3 should trial [in 2020] hopefully as it is just a replica [hence 4 silos?] of Arihant (S-3 Arighat launched 11/2017)”

S-4 and S-4* S-4 [not launched in 2018]  GK commented September 25. 2019  "I really don't know if they will be constructed. Some say, the S4 keel has been already laid and it is under construction. I am not so sure. I think the 6,000 ton Arihant and Arighat will serve as good training platforms" [Pete comments – My November 2018 report may be wrong. At just 7,000 tonnes (1,000 tonnes heavier than Arihant and Arighat) once thought future S4 or S4*’s hull diameter could not accommodate the tallness of a K-5 or K-6 missile – so S4 and S5 would only amount to high priced make-work projects for a SSBN continuous build program]

S-5 [at Wiki and at Submarine Matters] GK commented September 25, 2019 "S-5 should trial by late 2020s. [The S5 weighing 13,500 tonnes will have] K-5 or K-6 MIRV SLBMs [to] takes over as the sea leg of India's Nuclear Triad.
[Pete comment – a K-5 SLBM with a range of 5,000km would be inadequate from a Bay of Bengal launch point to hit all of China (especially Beijing). So India’s S-5 SSBN will need to be large enough/have a sufficient diameter to fit or retrofit a taller K-6 missile with a range of 8,000km. Also increased range to 8,000km would provide for a safer Indian SSBN launch point south of the rather closed Bay of Bengal (a bay where Chinese SSNs and SSKs may lie in wait for Indian SSBNs). China, with its improved relations with Bangladesh, Thailand and maybe Myanmar, may also more readily be able to string fixed undersea sensors that could focus on Indian SSBNs in the Bay of Bengal). Similarly Chinese undersea sensors strung across the Indian Ocean to the Seychelles and/or Mauritius may improve China’s ability to track nuclear submarines.]

INDIAN SSNs

CIMSEC commented "in February 2015, the Modi government accorded political approval for six SSNs." [Pete Comment - The main function of SSNs are to carry out patrols to protect SSBNs. For India this would be especially when its SSBNs are leaving the main Indian east coast naval base of Vishakhapatnam to go on deterrent patrol and re-entering Vishakhapatnam.].

GK commented September 25, 2019  [Russia turned down India’s offer to lease a Yasen SSN or provide related late model SSN Yasen level help]. [Russia instead offered “Chakra-3” an Akula lease and India accepted.] "Considering the perennial French struggle with LEU [submarine] reactors and their perceived drawbacks, I think India will try to or is already possibly duplicating the [Russian] HEU 190MWt OK-650B Akula reactor for [India’s] own SSN."

[CIMSEC commented "in February 2015 "Consequently, for [India's next SSBN may be called Arindhaman], there is a clear need to upgrade the reactor. The Arihant has an 85-MWt reactor (≈17 MWe, since in a naval reactor, roughly 5 MWt = 1 MWe). The one for the larger and heavier Arindham[an] will need to be somewhere between 160-190 MWt (32-38 MWe) and this is an upgrade that is ongoing."]

GK commented September 25, 2019 "As far as [GK is] concerned, the bigger focus should be on the SSN combat suite and sonar capability, where I think India should put its experience with TKMS and DCNS [now Naval Group] to good use. Especially the low frequency cylindrical array passive sonar etc. which are useful in hunting enemy SSNs. But a fully Indian SSN is unlikely before 2035 as things stand.”

GK commented September 25, 2019 I don't think the French gave any [SLBM] missile or reactor related help. [The French] consultancy I assume (ongoing) is for non-reactor/[Exocet?] missile design aspects of subs (probably SSNs under the garb of the Scorpene project). This is conjecture at best and very likely the French 'help' way more limited than the Russians.” [Pete Comment: France's Naval Group (was DCNS) may possibly have passed on some non-nuclear details useful for SSNs as part of India's current Kalvari class Scorpene Project and maybe in the future Project 75I (for India) bid.]

GhalibKabir (GK), Pete and CIMSEC  

December 2, 2024

K-4 SLBM Launch from Submarine & Indian Hypersonic Program Updates

On the 17th of November 2024, a test launch of the medium-ranged K-4 SLBM was conducted from the recently commissioned Indian nuclear ballistic missile submarine (SSBN) INS Arighaat. I had previously written about the commissioning of this boat which is also known as S3 or by its pennant number SSBN-81.

INS Arighaat is the second submarine in the Arihant-class, which comprises four SSBNs total - the first two (S2 Arihant & S3 Arighaat) with 4 x SLBM launch tubes and the last two (S4 & S4*, not yet named) with 8 x SLBM launch tubes.

It's being reported that this was the first test of the K-4 SLBM from an actual submarine (though some analysts in the know suspect this was just the first 'public' test from a submarine), all previous tests of the missile being from a submerged pontoon test platform.

With a stated range of 3,500 kilometers with a 1-ton (nuclear) payload, the K-4 serves a deterrence purpose by holding major Chinese targets like Beijing and Shanghai within its reach if employed from the northern portions of the Bay of Bengal.

Below is an older video of the missile from one of its previous pontoon-based tests.




However, having to launch from a very specific part of the water in order to reach those targets presents the Indian defence planners with a problem as those waters could be patrolled and/or monitored by Chinese PLA Navy SSNs, which are known to visit the Indian Ocean Region and India's periphery increasingly often. This is why India continues to pursue development of longer-ranged SLBMs like the K-5 and K-6, which supposedly have intercontinental ranges.

The K-5 may find application on the S4 and S4*, while the K-6 appears to be offering a definitive capability that would only equip the future S5-class SSBNs.


Artistic impression of the K4 SLBM; Sourced via overtdefense.com


A nominal range of at least 6,000 kilometers while carrying a MIRVed payload is necessary in order to attain credible deterrence value against the People's Republic of China - and that definitive capability appears to be India's eventual goal with its SSBN & SLBM programs. But this might only be achieved at some point in the next decade (2030s).

But what the K-4 also symbolizes in the meantime is an ability to ensure a truly survivable deterrence against India's other nuclear-armed adversary, Pakistan. The K-4's increased range over the previous K-15 SLBM would mean that India's SSBNs operating in the Bay of Bengal would now be capable of rapidly carrying out launches against major Pakistani counter-value targets like the capital Islamabad and the largest city Karachi without having to spend a considerable amount of time (several days) travelling from the Bay of Bengal to the Arabian Sea in order to bring at least Karachi into range (Islamabad would have still been out of reach for the K-15).


++++


Another interesting development out of India is the test of a Hypersonic missile reportedly called the Long-Range Anti-Ship Missile or LRAShM (pronounced L-Rashem?) on 16 November 2024. The configuration of the weapon appears to be a Hypersonic Boost-Glide Vehicle (HBGV) sitting on top of a large solid rocket booster which is estimated to have the same diameter as the K-4 SLBM.

The only officially stated number about this weapon seems to be its range - a reported 1,500 kilometers - and the fact that it travels at hypersonic speeds (Mach 5 or above) throughout its flight envelop, which might include several maneuvers/altitude variations considering it has the flight control surfaces to affect such movement.


LRAShM during its maiden public test; the object on top is the 'lid' of the sealed canister from which it was launched, it remained stuck on the nose cone for a short while after the ejection


No official figure is stated as to its maximum speed capability - with various analysts speculating it could be between Mach 6 and Mach 9. All that said, it could represent a capability similar to China's DF-17/DF-ZF which also employs a Hypersonic Glide Vehicle (HGV, not the same as a HBGV) payload employed over a similar range (1,600 km).

If deployed in ground-based launchers in the Andaman & Nicobar Islands, the LRAShM can pose a significant threat (over and above what the extended-range BrahMos already represents) to any Chinese PLAN surface task force and/or Carrier Battle Group attempting to traverse the Malacca Strait.


3D Model of the LRAShM by artist Kuntal Biswas, sourced via Twitter; the nose cone & the leading edges of the 'control fins' appear to be coated in a material that's tolerant of extremely high temperatures expected in hypersonic flight


If the Arihant-class ends up being relegated to a comparatively less demanding conventionally-armed SSGN role following the commissioning of the S5-class in the nuclear deterrence role, the LRAShM might also end up being carried by the Arihant-class boats. Just 4 to 8 of these weapons (considering they have a booster that is the same size as K-4's first stage) with conventional payloads wouldn't cause much damage to a land-based target, but can be potentially devastating in a long-range anti-ship/carrier-killing role.

The smaller upper stage (the HBGV itself), with an estimated diameter of 0.6m, might also be carried independently (without the booster, or with a smaller booster of the same diameter as the upper stage) for greater magazine depth (12 to 24 missiles, triple-packed in the silos just like the 0.74m diameter K-15 SLBMs) but with an understandably shorter range of perhaps around 500 to 700 kilometers.



Interesting things to look forward to.