Some observations are:
Descriptions of a huge 50 year to design, build and upgrade submarine program are
made by different people, at different times, for different purposes, targeting
different audiences.
Disruptions to the future submarine selection process made
it difficult for the Royal Australian Navy (RAN) and contestants to nail down final
submarine requirements and designs. Up to February 2015 then Prime Minister
Abbott unilaterally chose Japan. From February 2015 a selection process hid the reality that Japan was quietly still the
winner. Japan was ahead until Abbott was removed from the Prime Ministership in September 2015. Once Prime
Minister Turnbull was appointed the field was opened up to the 3 contestants
(Germany, France and Japan) with a normally 3 year submarine selection period
being compressed into 7 months (September 2015 to April 2016).
Turnbull chose to rapidly publicise the Future Submarine winner
on
April 26, 2016 in order to
win South Australian votes in the early July 2, 2016 National Election.
With the pork barrel of
a $50 Billion project mainly at Osborne, Adelaide, South Australia Turnbull’s
submarine-to-win-the-election-strategy succeeded in getting his government over
the line by one crucial electorate/district/seat/vote.
Naval Group (then DCNS) had to publicly react quickly to
Turnbull’s premature (April 26, 2016) announcement with as positive and concrete
a submarine package as possible. For example Naval Group’s concept submarine was
termed the “Shortfin Barracuda Block
1A” to indicate to the public that it was a solid building block
in a highly developed submarine program. Shortfin was also presented as a conventional outgrowth of an
already highly developed Barracuda nuclear submarine program.
Final Issues To Be
Decided In Years To Come
In fact in a huge submarine program specific submarine
characteristics can only be assessed and finalised once a finalised scale model
can be hydro-dynamically tested or even after the full-sized first of class begins
trials in the open sea (noise? cavitation?) in about 2031. Issues include:
- length will fluctuate depending on many variables including the size of the bow sonar (Lockheed
Martin (LM) input as one small part of its combat system) and whether a pump jet is added or
rejected.
- diameter could fluctuate (how many decks, bunk sizes and
numbers, arrangement of how many
torpedo tubes (LM), VLS? how many and size of diesels,
batteries, fuel tanks, water ballast?
- fuel cell AIP? inefficient to carry the LOX over
Australia’s long transit distances, lack of
observable French progress with Fuel
Cell and lack of observable RAN interest
- the first pump jet as standard on a SSK class. This would be a radical solution for the
technologically conservative RAN
- RAN conservatism would also likely reject Australia becoming the
second LIBs user after Japan.
At 8/10/17 5:13 PM someone with access to Naval Group
thinking commented, in part:
“I think you will find that the [Australian Government] govt was well
aware that both the DCNS & TKMS designs were just concepts (basic design
only). Both required complete detailed design from scratch. Both would have
used existing designs for reference (you don't reinvent the wheel unless you
have to)...It will definitely be more like a conventional powered Barracuda
than a stretched Scorpene (for a start you would have to stretch a Scorpene in
all directions, not just make it longer)...”
A submarine builder’s technical design knowledge base, influencing future submarine designs, often goes back a century. The designs of the
Scorpenes and Barracudas are only the latest. See the Table below.
Naval Group Submarine Development TABLE (by Pete)
Submarine
(how many built?)
|
First Sub Laid Down
|
Last Sub Commissioned
|
Some still building?
|
Classes pre Agosta
|
1863 the Plongeur
1957
France only
1960?
|
many classes pre 1957
1960
1975 France &
Export
|
No
|
Redoutable SSBNs
6 built France only
|
1964 (1st
commissioned 1971
|
2008
|
No
|
Agosta SSKs
13 built
|
Early 1970s French,
Spanish & Pak Navy
|
2006, 3 Spanish, 5 Pakistani
remain
|
No
|
|
6 built 2,500 tonnes
|
1976
|
No
|
|
Rebuilds of the 6
existing Rubis SSNs
|
1995
|
No
|
|
Triomphant SSBNs
4 built
|
1986
|
2010
|
No
|
Scorpene SSKs (14 total)
2
built---------------------
2 built---------------------
1 built so far
-----------------------------
|
2006
2009 Malaysia
2016 (1st
planned)
2020 (1st
SBR-1)
|
No
No
5 x Kalvaris 1 per
year
|
|
SN-BR SSN just 1 DCNS designing non-nuclear portion. 4 to 5,000 tonnes.
|
2024 (maybe) after the
SBR-SSKs
Brazil building reactor.
|
2034 (or later) likely. Also
depends on Brazilian economy.
|
1 in medium-long term
|
|
French only SSNs
6 planned
|
2007
|
2029 for the last
of the six
|
Yes
|
2028?
|
2052? Assuming all
are SSKs? 1 built/2 years?
|
Future
|
|
|
4
likely
|
2035?
|
2050? Assuming one
sub built every two years
|
Future
|
Pete