April 10, 2015

Pace of India's nuclear submarine program, Arihant, Chakra.

Perhaps a minimally doctored August 2014 photo of INS Arihant. It shares similarities with Russia's latest, minimally humped, Borei class SSBN and the preceding very humped, sail planed, Russian Delta SSBN.
---
Minimally humped, Borei class SSBN 
---
A very humped Delta II class SSBN with sail planes like Arihant.
---

MISSION

On April 5, 2015 I was tasked by "lachit" to assess India's nuclear submarine state of play:

"India needs to get her nuclear subs SSBN & SSN & SSGN up running pronto. Can you guess which subs will ultimately take over the role of SSGN? I would surely like to know your personal opinion on the capabilities of Arihant sub. Thanks

On April 8, 2015 (and in the same thread) Biswajit Pattanaik augmented my tasking with the preamble:


@"lachit" my bet will be on S2/ARIHANT,S3 &S4 SSBNs that they will be converted into SSGNs. This will happen when in the future the better & the bigger SSBNs i.e. S5,S6 & S7 comes into service.

Hi Pete,
Just want to add something about Future Indian SSNs. According to me either Indian Navy could go with a Barracuda based SSN or even a Scorpene based SSN just like the Brazilians Sn-BR SSN. What's your take on this?"

RESPONSE

To which I respond:

You entrust me with grave responsibilities :) My personal response, is:

I've followed INS Arihant's publically available information since it was launched in June 2009. At the launch ceremony (then) Prime Minister Singh thanked the Russians implicitly for their ongoing assistance on the submarine reactors on "S-1" and S-2.

S-1 is the half submarine reactor test rig at Kalpakkam (India's southeast coast, just south of Chennai)
S-2 is INS Arihant itself (undergoing trials - may never be operational).
S-3 is INS Aridhaman (under construction at the Shipbuilding Centre Visakhapatnam (India's east coast)) probable launch perhaps late 2015 or in 2016 - will be the defacto first of class SSBN initially with K-15s.
S-4 no name yet (under construction Shipbuilding Centre Vadodara prior to launch perhaps in 2017)

Arihant was/is only intended as a technology demonstrator (particularly for the reactor) a bit like the USS Nautilus rather than a serious first of class. Unlike the Nautilus there has been no list of Arihant's nuclear sub achievements eg. long submerged range or endurance. This makes me suspicious that Arihant has had major problems with its reactor functioning - the major new piece of technology. The need for security - away from prying Pak or Chinese craft - may be another reason for avoiding long semi-public sea voyages.

The delays in Arihant seem to have increased unrealistic expectations that it could be an operational submarine design.

The distinction between SSN's and new-build SSGN's (G for guided missile) is largely historical and decidedly Russian. The distinction mainly rested on the first SSN's being only horizontal torpedo tube armed and very much orientated to torpedos and mines with few or no missiles. 

Over the last 20 years SSN-SSGN distinctions have become clouded  as horizontally launched missiles have become a major component of an SSN's armament. An even more fundamental structural change has been Vertical Launch Systems for most new build SSNs (be they Akulas, Yasens, later Los Angeles and Virginia class). Therefore new build SSGN's have been merged into "SSN" or in the case of the Yasen "multi-purpose". I think India will be building "multi-purpose SSNs" in the direction of the Chakra class (Akula II) rather than separate SSN and SSGN designations. However, Arihant may evolve into the only SSGN and specialising in missile tests, rather than being an actual new build SSGN.

Advances in missiles' range mean that even SSN fired cruise missile have (or will have) the range to hit anywhere in Pakistan while land launched Agni IIIs (with a light warhead load) can hit anywhere in China. Agni III's will be supplemented by K-4 SLBMs in around a decade. 

It would be tidy for India to have a firm build schedule for nuclear subs S3 through S7 but I think India's build schedule is still under development and heavily dependent on Russian advice - in exchange for India paying excessive amounts for Russian arms (effectively subsidization). Also India has unique geography and needs that submarine types can be iteratively evolved around. India is not the US or Russia than can afford 10 new SSBNs and 20-40 new missile armed SSNs. Multi purpose Indian designs may become a substantial component.

The initial Indian SSNs, if they stay at the Arihant class' displacement of 6,000 tons (surfaced) will be underpowered unless they have an uprated reactor (maybe 130 MW). This may take some years to achieve. The reactor in the Chakra/Akula is an obvious item to study. As the study of reactor safety takes decades I suspect that Russian advisers are on hand towards the rear of the Chakra and Arihant.

An SSBN version of the Arihant appears to have the right sized reactor if the speed specifications are accurate.

Rather than Arihant and follow on subs being influenced by French nuclear submarines (like the Barracuda) I think Russia's Delta class and Borei subs are already a strong influence. India was, and I assume still is, extraordinarily committed to two Chakra/Akula IIs. India appeared to cross subsidise Russia nuclear sub building program in the long years Chakra/Akula was being built when Russia was crying out for defence money.

Much patience is needed tracking India's nuclear sub program. Unlike the 10+% of Russian and US GDP's that resulted in rapid nuclear sub program gains in the 1950s-60s India is only spending around 2.5% GDP on defence (according to Stockholm SIPRI stats). This is not a breakout amount for rapid increases in numbers or models. India's nuclear sub program also faces competition from the probably highest priority Agni IRBM-ICBM program and from India's conventional military priorities.

The launch of INS Aridhaman, perhaps later this year, will be the next major step.

Please connect with India's Rising Nuclear and Conventional Submarine Force, May 21, 2015 http://gentleseas.blogspot.com.au/2015/05/indias-rising-nuclear-and-conventional.html .

Pete

July 3, 2013

Indian strategic weapons programs - gradual progress


The following Indian strategic weapon update indicates gradual progress in several areas. No weapons mentioned in the article are fully developed and will not be fully operational for several years.  India's Defence Research and Development Organisation (DRDO) update is partly to justify, to the public and politicians, the considerable amounts spent on weapons development.

Updates provided by DRDO include:

  • another test later this year of the Agni 5  ICBM. The test subsequently occurred on September 15, 2013 - see http://gentleseas.blogspot.com.au/2013/09/a-second-agni-5-test-any-mirv.html
  • the reactor of Indian built submarine INS Arihant may go critical - it went critical on August 10, 2013 http://gentleseas.blogspot.com.au/2013/08/ins-arihants-reactor-goes-critical.html 
  • a July 2013 test of India's future Ballistic Missile Defence system - see earlier test information - http://gentleseas.blogspot.com.au/2012/11/another-successful-advanced-air-defence.html
  • another test of India's (part Israeli designed) Nirbhay cruise missile - details of first test http://en.wikipedia.org/wiki/Nirbhay_missile#First_Trial and
  • further tests of the Astra air-to-air and Nag anti-tank missiles.



  • In May 2013 V.K. Saraswat (above right) Director-General of the Defence Research and Development Organisation (DRDO) and Scientific Advisor to the Indian Defence Minister, was interviewed  (Read: Transcript of full interview) concerning a number of Indian strategic weapon programs, including India's first indigenously built submarine INS Arihant .

    ---------------------------------------------------------------

    On May 28, 2013, based on the Saraswat interview, The Hindu published the following article concerning:

    http://www.thehindu.com/news/national/agniv-to-be-modified-to-attack-multiple-targets/article4758676.ece

    "Agni-V to be modified to attack multiple targets

    Weapon system to be fitted with Multiple Independently Targetable Re-entry Vehicles
    The configuration of Agni-V, India’s long-range nuclear weapons capable ballistic missile, is set to be changed to make the 5,000-km weapon system deadlier and capable of attacking multiple targets.
     
    The modification is to enable fitting Agni-V with Multiple Independently Targetable Re-entry Vehicles (MIRVs), V.K. Saraswat, Director-General of the Defence Research and Development Organisation and Scientific Advisor to the Defence Minister, told The Hindu. Another test in the present configuration of the three-stage missile would be conducted later this year.
     
    Besides imparting canister-launch capability, Agni-V would be equipped with MIRVs. “Work on that is going on and it is at design stage.”
     
    The resounding success of the maiden flight test of Agni-V in April 2012 catapulted India into a select league of nations having the technological prowess to develop Inter-Continental Ballistic Missiles, he said. The Agni series will form the bulwark of land version of India’s nuclear deterrence triad.
      
    Meanwhile, the reactor on board the indigenously-built nuclear powered submarine, INS Arihant, is expected to go critical in a few weeks. The powering of the system should happen in a week or two, Dr. Saraswat said.
     
    (Once that happens, the 80-MWt (thermal) reactor would be in a position to deliver power to the platform and sea trials of Arihant would begin subsequently when the submarine is expected to move at the designed speed, go to the diving depth, attain maximum speed and perform all safety and emergency operations).
     
    Referring to the home-grown Ballistic Missile Defence programme, he said the next interceptor missile test to be conducted at a higher altitude of 100-150 km in July would be the most important one. “We have developed a new interceptor missile for it.”
     
    Another crucial DRDO missile test this year would be a “repeat launch” of ‘Nirbhay’. During the maiden trial of the subsonic cruise missile, the flight had to be terminated midway after it strayed from its trajectory. Dr. Saraswat attributed the problem to a manufacturing defect in the navigation sensor. Flight tests of air-to-air Astra and anti-tank Nag missiles would be also conducted."
    -
    COMMENT

    The Indian Government has indicated that once Arihant's nuclear reactor (under development for two decades) goes critical, Arihant will undergo several years of sea trials. Arihant, has already undergone limited trials at India's East coast naval base at Visakhapatnam for the last three years.

    The induction of INS Arihant into the Indian Navy's fleet will complete the crucial link in India's nuclear triad - the ability to fire nuclear weapons from land, air and sea.  So far, only the US, Russia, France, China, the UK (and possibly Israel) have the capability to launch a submarine-based ballistic missile.

    There is some concern over the overall strength of India's submarine fleet. India has 14 conventional diesel-electric submarines. Most are aging and outdated.
     
    Not mentioned in the DRDO update is India's most formidable submarine - the nuclear powered attack submarine INS Chakra (formerly the Russian Nerpa) long leased from Russia and built in Russia based on the Akula II design.
    -
    Pete