I'm publishing news about subs and other issues at a slower tempo. Unlike most advanced countries Australian submarine changes are slow: first LOTE by 2030? 1 used Virginia by 2036 or later? But missiles and novel warheads always tempt. Shawn C and Gessler are welcome to post articles on SubMatts. Cheers Pete
May 15, 2020
India’s INS Arihant SSBN compared to US Ohio-class SSBNs
"The very choice of JT Ship Service Tomasz Jatkowski from Gdynia to repair the MGK-400 complex is not surprising. It was with this company that two contracts were concluded in December 2019 regarding the submarine ORP "Orzeł" for about PLN 624 thousand gross, under which six sets of power cables were to be supplied (for PLN 72,000 gross) and repair of PZKG-11 periscopes (for PLN 552,000 gross)."
"Experience shows that JT Ship Service Tomasz Jatkowski will definitely do its job and restore the main sonar system of the ship to working order. However, it will still be a hydroacoustic complex from the eighties, without a modern sound analysis system and connection to a new, automated combat system."
Hi Pete,
ReplyDeleteIt seems that time has left its mark on the Polish submarines ORP "Orzeł" - not modernization but repair
"The very choice of JT Ship Service Tomasz Jatkowski from Gdynia to repair the MGK-400 complex is not surprising. It was with this company that two contracts were concluded in December 2019 regarding the submarine ORP "Orzeł" for about PLN 624 thousand gross, under which six sets of power cables were to be supplied (for PLN 72,000 gross) and repair of PZKG-11 periscopes (for PLN 552,000 gross)."
"Experience shows that JT Ship Service Tomasz Jatkowski will definitely do its job and restore the main sonar system of the ship to working order. However, it will still be a hydroacoustic complex from the eighties, without a modern sound analysis system and connection to a new, automated combat system."
In the meen time in Sweden A19 Submarine HSwMS Gotland Back In Swedish Navy Service Following Upgrade
/Kjell