tag:blogger.com,1999:blog-19245896.post3929105653433855148..comments2024-03-30T00:14:23.992+11:00Comments on Submarine Matters & Australian Nuclear Weapons: Additional Data - One Japanese estimate, Build + Maintain 10 Australian SubmarinesPete2http://www.blogger.com/profile/06134037393078707072noreply@blogger.comBlogger6125tag:blogger.com,1999:blog-19245896.post-27975316287269725082016-01-23T19:12:44.300+11:002016-01-23T19:12:44.300+11:00Hi S [Jan 22, 10:20PM]
Thanks for " (1.5B ye...Hi S [Jan 22, 10:20PM]<br /><br />Thanks for " (1.5B yen) due to torpedo and missile".<br /><br />I have added that to the text.<br /><br />Regards<br /><br />PetePetehttps://www.blogger.com/profile/02624742078679760819noreply@blogger.comtag:blogger.com,1999:blog-19245896.post-67559289154943954782016-01-22T22:20:39.690+11:002016-01-22T22:20:39.690+11:00Hi Pete
The executed budget of 23SS was 54.6 B ye...Hi Pete<br /><br />The executed budget of 23SS was 54.6 B yen higher than above mentioned budget (53.1 B yen). I think this budget difference (1.5B yen) due to torpedo and missile. I could not estimate these costs, because I did not have detail information.<br /><br />Regards<br />S<br />Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-19245896.post-17368306163386371322016-01-20T12:57:24.788+11:002016-01-20T12:57:24.788+11:00Hi S
Thankyou for your three extra comments.
Reg...Hi S<br /><br />Thankyou for your three extra comments.<br /><br />Regards<br /><br />PetePetehttps://www.blogger.com/profile/02624742078679760819noreply@blogger.comtag:blogger.com,1999:blog-19245896.post-27093314131317036772016-01-19T01:56:52.790+11:002016-01-19T01:56:52.790+11:002 Corrections
Before correction
it means LCC of 1...2 Corrections<br /><br />Before correction<br />it means LCC of 10 submarine is 160B yen.<br /><br />After correction<br />it means LCC of one submarine is 160B yen.<br /><br />Before correction<br />160B yen with 10 subs may be tough, but 240B yen is very achievable, I think.<br />After correction<br />1600B yen with 10 subs may be tough, but 2400B yen is very achievable, I think.<br /><br />Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-19245896.post-37777012058698222502016-01-19T01:36:01.128+11:002016-01-19T01:36:01.128+11:00According to official data, costs of 23SS (total c...According to official data, costs of 23SS (total cost 53B yen) are as follows:<br /><br />Command System (2.5B yen):<br />C2T(Command and Control Terminal) & MTA(Maritime Terminal Adapter), LCS(Launch Control System), NICI(Navigational Instruments Connection Interface), TDBS(Target Data Base Server) and TDS(Tactical Display System) <br /><br />Weapon and Sensor System (10B yen): <br />Electro-optic mast,13m Periscope, Submarine sonar system, Jamming system, Radar system, 53cm Torpedo tube, Harpoon launching system, Submarine decoy, Sound device for submarine decoy<br /><br />Communication System (0.4B yen):<br />Radio communication device, Secure &Encryption device, Bridge information display, Submarine signal flare, Antisubmarine morse signal, Rescue signal generator for submarine <br /><br />Propulsion, Batteries, Generators and Building Costs (40 B yen):<br />Submarine electric motor, Stirling AIP generator, Submarine building, Diesel generator, Main batteries, Condenser of cooling units.<br /><br />Regards<br />S<br />Anonymousnoreply@blogger.comtag:blogger.com,1999:blog-19245896.post-62607640796850930482016-01-19T01:35:27.730+11:002016-01-19T01:35:27.730+11:00Hi Pete
Life cycle cost (LCC) means total cost in...Hi Pete<br /><br />Life cycle cost (LCC) means total cost including design, building, operation/maintenance and abolishment stages. MoD reports LCC of submarine based on the actual data every year. I estimate LCC is twice of building cost in the case of 30 years, it means LCC of 10 submarine is 160B yen.<br /><br />Hardware of command system is not so expensive, but license fee of US software should be considered. The torpedo tube is expensive, and I think US torpedo tube is cheaper, because US built much more submarine. Modification of fuel tanks, improvement of endurance and hull lengthening will be conducted, but they are not bigger modification than that in Oyashio-to-Soryu (+8B yen) which includes hull lengthening, coating by blanket absorber and installment AIP generator. 50% of Building cost (30B yen) is labor cost, and I considered GDP per capita ratio between Japan and Australia (= 0.6), then premium becomes 10B yen (=30B yen x 0.5/0.6). 160B yen with 10 subs may be tough, but 240B yen is very achievable, I think.<br />Anonymousnoreply@blogger.com